In the process of perforation and fracturing of horizontal wells, the main function of the cable pressure control equipment is that the fracturing vehicle hydraulic pressure pumps the perforating gun and the bridge plug hydraulic into the downhole level pre-calculated position.
In the process of perforation and fracturing of horizontal wells, the main function of the cable pressure control equipment is that the hydraulic pressure of the fracturing vehicle is pumped into the pre-calculated position of the horizontal section of the downhole and the plug is not blown, And after the completion of a period of time, replace the gun and shoot, under pressure again run in a new horizontal section, in such continuous perforation, but do not blow off the circulation process, dynamic and static to seal the wellhead, control the wellhead pressure, Provides pressure buffers and transition zones for bridge plug and perforating gun strings. At the same time, during the operation of the wellhead accident, you can ensure that the wellhead closed, so as to prevent gas wells burst accident.
The whole set of wireline pressure control equipment string (WPCE) mainly comprises wireline grease injection control head, hydraulic control tool catcher, lubricator, hydraulic control tool trap, hydraulic control double-ram bop, pump-in sub, crossover sub, crossover flange, transportation trailer, hydraulic control and grease injection pressure control system, all kinds of pipes and other components.

Specification and parameter of Horizontal Well Cable Pumping Bridge Plug Fracturing & Perforation WPCE


Model
Working              
Pressure                      
(Psi)
Lubricator                  
ID(mm)
Cable ID
(mm)
Sealing
Model
Service
Conditions
Working
temperature                     
SLFP12-35
5000

120





φ5.6mm~φ12.8mm



Grease injection sealing+
Rubber element sealing +sealing stuffing



Water, crude
 oil,
Natural gas                  
with H2S and CO2




T-20(-29℃~+121℃)
SLFP12-70
10000
SLFP12-105
15000
SLFP13-35
5000

130
SLFP13-70
10000
SLFP13-105
15000
SLFP14-35
5000

140
SLFP14-70
10000
DLFP14-105
15000
SLFP16-35
5000
150
SLFP16-70
10000
SLFP18-35
5000
180
SLFP18-70
10000

Note of Horizontal Well Cable Pumping Bridge Plug Fracturing & Perforation WPCE

1. There are Bowen and Otis quick union for all threaded selective
2. Additional size available on request